Skip to content

Pull requests: openshift/release

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

ARO-HCP: skip e2e-parallel for dev-infrastructure and observability changes do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#82590 opened Jul 29, 2026 by cssjr Draft
1 of 2 tasks
ROSAENG-60066: Wait for secondary operator-managed deployments in install step approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#82589 opened Jul 29, 2026 by dustman9000 Member Loading…
2 tasks
OU-1108: installing coo from quay approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#82588 opened Jul 29, 2026 by etmurasaki Contributor Draft
ROSAENG-62569: enable the monitoring tests approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#82587 opened Jul 29, 2026 by bmeng Contributor Loading…
NE-2821: Add tls-scanner job for TLS1.3 on Gateway API jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#82586 opened Jul 28, 2026 by rikatz Member Loading…
[ART-21799] add support for logging 6.7 approved Indicates a PR has been approved by an approver from all required OWNERS files. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#82585 opened Jul 28, 2026 by pruan-rht Member Loading…
Adding metrics to archive approved Indicates a PR has been approved by an approver from all required OWNERS files.
#82584 opened Jul 28, 2026 by paigerube14 Contributor Loading…
quay/quay-tests: run stage performance test nightly approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#82581 opened Jul 28, 2026 by deshpandevlab Contributor Loading…
Rename cudn-incremental-700 to cudn-incremental-1000 and increase step size approved Indicates a PR has been approved by an approver from all required OWNERS files.
#82579 opened Jul 28, 2026 by redhat-chai-bot Contributor Loading…
stackrox: remove ocp4.21 config approved Indicates a PR has been approved by an approver from all required OWNERS files. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#82578 opened Jul 28, 2026 by davdhacs Contributor Loading…
ROSAENG-59003 | chore: Clusters cleaner prow onboarding approved Indicates a PR has been approved by an approver from all required OWNERS files. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#82577 opened Jul 28, 2026 by jfrazierRedHat Contributor Loading…
OCPKUEUE-755: add 4.23 kueue jobs approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#82576 opened Jul 28, 2026 by kannon92 Contributor Loading…
CNTRLPLANE-3846: Multiple CI jobs failing for 4.22. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#82574 opened Jul 28, 2026 by amogh-redhat Loading…
ARO-HCP: move provisioning step-registry scripts to ARO-HCP repo do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#82572 opened Jul 28, 2026 by gmfrasca Member Loading…
openshift-logging: Use CI-built images of api and opa-openshift for 5.y approved Indicates a PR has been approved by an approver from all required OWNERS files. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#82571 opened Jul 28, 2026 by xperimental Contributor Loading…
ROSAENG-1332: Add hp-sre-rosa-ci RBAC for rosa-cluster-lease on hosted-mgmt jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#82570 opened Jul 28, 2026 by dustman9000 Member Loading…
ROSAENG-61214 | chore: add Prow presubmit CI jobs for hcm-deployment approved Indicates a PR has been approved by an approver from all required OWNERS files.
#82569 opened Jul 28, 2026 by gdbranco Contributor Loading…
setup assisted-installer version v2.55 approved Indicates a PR has been approved by an approver from all required OWNERS files.
#82568 opened Jul 28, 2026 by danmanor Contributor Loading…
AGENT-1569: run IRI deletion tests do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#82566 opened Jul 28, 2026 by pawanpinjarkar Contributor Loading…
Make e2e-aws-openshift-node-compliance optional for ComplianceAsCode PRs approved Indicates a PR has been approved by an approver from all required OWNERS files.
#82565 opened Jul 28, 2026 by Vincent056 Contributor Loading…
WIP - Perfscale max pods approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#82564 opened Jul 28, 2026 by afcollins Contributor Draft
INTEROP-9361: Add FIPS variant ci-operator config for OPP jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#82563 opened Jul 28, 2026 by amp-rh Contributor Loading…
3 tasks
Add draft s390x VPN connectivity test do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#82562 opened Jul 28, 2026 by Davo911 Member Draft
Add rebasebot periodic job for openshift/functions-operator approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/invalid-owners-file Indicates that a PR should not merge because it has an invalid OWNERS file in it.
#82561 opened Jul 28, 2026 by gauron99 Loading…
ProTip! Find all pull requests that aren't related to any open issues with -linked:issue.